Studio Two construction has begun

Today we managed to get the new lighting and wall outlets installed as well as removing the old cabinets and bits of shelving. Next up is insulation and drywall. That will be a challenge as several pieces need to go up in the ceiling.

The building stripped of just about everything before work begins.

Leave a Reply

Your email address will not be published. Required fields are marked *