Today we managed to get the new lighting and wall outlets installed as well as removing the old cabinets and bits of shelving. Next up is insulation and drywall. That will be a challenge as several pieces need to go up in the ceiling.
Monthly Archives: September 2017
Studio Two work begins
Today begins the remodel work on a new space. I have an empty 12 foot x 14 foot building that will be my new studio. This will be a dedicated electronics, 3D printing, rocket work space. I am calling it Studio Two. Photography will be a little cramped for a while but I plan on having a Studio Three sometime after that. There is a lot of work to be done, starting with a power upgrade and insulation.